A thumbnail for project image

Lombatori Space

Client:
Lombatori
Duration:
10 Months
Country:
Italy
Year:
2024

The Horizon Industrial Warehouse Facility was developed to support high-volume logistics operations with a focus on durability, efficiency, and scalability. The client required a robust structure capable of handling intensive daily operations while optimizing workflow across storage, loading, and distribution zones.

CHALLENGES

The project demanded a fast construction timeline without compromising structural integrity. Additionally, the facility needed to support heavy load capacities, ensure smooth circulation for transport vehicles, and maintain optimal ventilation in a large enclosed space.

OUR APPROACH

We implemented a prefabricated steel structure system to accelerate construction while maintaining precision and strength. The spatial layout was carefully planned to separate operational zones — storage, loading docks, and vehicle circulation — ensuring efficiency and safety.

High-performance concrete flooring was engineered to withstand continuous heavy loads, while large-span structures eliminated unnecessary columns, creating a more flexible and open interior.

A dark and cozy room with dishwaser
A minimalist and cozy room image
A cozy and sunny condition of the woody kitchen set
A clean white sofa with vibrant background
No items found.

HIGHLIGHTED FEATURES

  • Wide-span steel structure for maximum open space flexibility
  • Heavy-duty concrete flooring with up to 8-ton load capacity
  • Integrated loading dock system for efficient logistics flow
  • Optimized natural ventilation & daylighting
  • Durable material selection for long-term industrial use

IMPACT

The project was completed 22% faster than conventional construction methods, allowing the client to begin operations ahead of schedule. The improved layout and structural system increased overall distribution efficiency by 30%, while reducing long-term maintenance costs.

Next Project
A finished modern building aligned with its project
2025
View Project
Emerald Luxia Residentials
Ireland
12 Months